Then rebuilding the wall is halfway done, all that's needed is to insulated it and board it up with either drywall or heavy duty plywood.
Then it's to installing the heating stove, and that is also halfway done.
and then I'm back in Valdez! after two weeks time to leave a well enough notice to want to transfer back to the Valdez Safeway.
soooooooooo I'm looking at around the last week of the month.
Devious Comments